Essential Installation Requirements for ACLN2-10S
Overview
Installing the ACLN2-10S from Allum Corporation is a meticulous process that requires careful planning and preparation. Proper installation is crucial not only for optimal performance but also to maintain the product warranty. This guide outlines the essential prerequisites to ensure a successful installation.
Equipment Unpacking
Before you begin the installation, confirm that you have the necessary tools and assistance:
- Manual Forklift: Essential for safely removing the equipment from its wooden pallet.
- Two-Person Team: The ACLN2-10S weighs approximately 364 kg; having assistance is vital for safe handling.
- Photographic Documentation: Take images of the equipment's packaging and labels upon arrival for your records.
Packaging Contents
When unpacking the equipment, ensure that the following items are included:
- 1x Liquid Nitrogen Generator
- 1x 1.5-meter Stainless Steel Hose
- 1x Tool Kit
Installation Space Requirements
Ensure that the installation area meets the following specifications for proper functioning:
Water and Environmental Conditions
Demineralized Water Supply
Before operating the machine, ensure the following:
- A mandatory supply of approximately 6 liters of demineralized water.
- Check that the internal drain (located at the back, lower left corner) is closed before filling.
- Monitor the water level indicator during the filling process.
Temperature Control
To maintain optimal operating conditions:
- Keep the environment between 20°C to 22°C with relative humidity below 90%. Air conditioning is recommended for stable conditions.
- Use a thermo-hygrometer near the machine to continuously monitor ambient and dissipated temperatures.
Electrical Requirements
Power Specifications
Ensure the following electrical specifications are met:
- Voltage: 200-240 VAC Single-phase + Neutral + Ground / 60Hz
- Dedicated Circuit: Install a dedicated bipolar circuit breaker capable of handling a minimum of 25A (suggested 4 mm² conductors for runs up to 10 m).
Additional Recommendations
- Power Protection: To safeguard against power surges or outages, consider installing a delay relay with a 120-second setting.
- Industrial Plugs: A pair of 16A Steck Industrial plugs is required (to be provided by the client).
Compliance and Warranty
It is crucial to adhere strictly to the installation guidelines, as failure to do so will void the product warranty. All damages arising from non-compliance will be the responsibility of the client. Notify LabSolutions of any electrical conditions prior to installation to avoid complications.
For further assistance, please contact the Engineering and Services Department at [email protected].