Diagnostic Unit for Testing Electric Charging Points Type 2
The test instrument is intended to examine the functional performance of charging stations with Type 2 connector (loading mode 3). The test instrument is connected to the charging station for this purpose in order to document the communication between the charging station and the test instrument. If the loading process does not start, the error source can be quickly identified.
The H+E BASE 32 of PROFITEST is suitable for use in R&D and service applications.
Diagnosis of electrical charging stations with a single test instrument:
- Vehicle states
- Cable condition
- Error states
- PWM signal evaluation
- Phases and phase sequence
- Battery level
Error simulations:
- Diode short circuit in the vehicle circuit
- Short circuit between CP and PE
- RCD test by shooting and braking time measurement
- Indication of states by means of easy-to-understand symbols
- Simple operation and diagnostics
- Compact, battery-powered device, therefore suitable for external use
Product Highlights
Connection option for a test consumer via an integrated EEC socket (400 V, maximum 32 A)
Applications
View
status Status of Vehicles (CP) Exibables
- No vehicle connected
- Vehicle connection
- Vehicle ready for loading without ventilation
- Vehicle ready for ventilating charging
Cable type (PP)
- Without cable, 13 A
- Cabo, 20 A
- Cabo, 32 A
- Cabo, 63 A
Simulable errors
- Short-circuited diode
- CP-PE short circuit
- RCD shot because I = 30 mA between L1 and PE
- Technical characteristics
- Connection option for a test consumer via an outlet Built-in EEC (400V, maximum 32 A)
- Compact cabinet, ideal for service calls
- Large display for which backlighting can be activated
- Selectable interface language: D, GB, F, E, I, PT
- Power supply via two 9V block batteries (rechargeable) or a power pack
- USB data Interface for firmware updates
- Features
Diagnostic Information
- Measurement Parameter Settings
- Phase L1, L2, L3 On/Off
- Phase sequence clockwise/anti-clockwise
- Resulting load current (via work cycle evaluation) a
PWM signal
- Frequency in Hz (adjustment point = 1 kHz)
- Working cycle (with PWM) as Percentage
- Positive Voltage: 3, 6, 9, 12 V
- Negative Voltage: 12 V
- Documentation / Downloads
- Operating Instructions (PDF | 787.3 KB)
- Technical data (PDF | 245.9 KB)